Skip to main content
Username
Scott Greenbaum
Proposer First Name
Scott
Proposer Email
sgreenbaum@earthlink.net
Proposer Last Name
Greenbaum
Proposer Company/Organization
Greene Energy Consultants, LLC
Proposer Phone
(781) 405-2780
Proposer Job Title
Principal
Proposer Additional Info
Professional Engineer, CPHC, CEM, CBCP, GBE
Proposed Session Description
MassDOT’s new all-electric high-performance net-zero facility, Cental Regional Headquarters, is an 80,000 SQFT office building occupied in 2022 with 1-MW PV system and car chargers. The building has triple glazed windows, VRF with decoupled heat recovery VAV DOAS ventilation system, and multiple layers of control. The building experiences comfort, glare, control issues, etc. I will examine the causes and solutions employed to mitigate.
Diversity and Inclusiveness
All employees deserve a clean, comfortable, safe, and climate friendly workplace. The proper application of high performance all electric buildings with properly applied VRF technologies this can become a reality exceeded expectations.
Learning Objectives
Identify conditions that affect employee productivity.
Identify conditions that affect occupant comfort beyond average space temperature.
Examine what happens when there are multiple layers of control of mechanical systems.
Examine why building codes are important to follow in designing and high performance all electric net zero buildings.
Has this session been presented before?
No
Target Audiences Level of Expertise
Level 3 - Prior knowledge strongly recommended.
Session Format
Workshop or skill-building session
Session Format Details
30 to 40-minute presentation with two (2) 10-minute question/answer periods.

Strongest Content Connection - Boston 2023

Comments about your speaker roster
As the Post Occupancy Commissioning Agent, I was hired to complete the new building commissioning project and find solutions to persistent comfort and building control problems. The contracted Commissioning Agent stopped supplying commissioning services and did not complete the job. The Architect and Engineering firms had closed shop. I perform forensic engineering to correct issues in an occupied building. This is my favorite type of project. This is the first high performance all electric building I have worked on. I applied all my experience and training I received from PHIUS and NESEA to this project to determine the root cause of the problems and engineered solutions.
Reviewer 1
Veerkamp, Danny
Reviewer 2
Veerkamp, Danny
Proposal #
223
Committee Decision
Being Considered

Presenters

Full Description
If the solution to climate change is high performance all electric buildings, they have to perform! After 40 years in this business, I have seen early adaptors produce poorly implemented and the technology never gets a chance to become the industry standard because they get bad repetitions. Repetition is critical! Critics will simply say high performance all electric buildings do not work therefore we will not build them. Making the same mistake again and again is a death sentence. To get widespread adoption of these technologies' implementation has to be correct. It is time to learn from the details of maximum application.